Cabin Maison de repos “Esneux”
Maison de repos Esneux
Deba installed a brand new station “Maison de repos Esneux” equipped with DR-6+ RMU, 630 kVA cubicles from SGC.
What makes this project so unique?
The great basement of the station! We worked with our sister company CDC to create a custom-built station that could withstand flooding. It is placed 2 meters above the ground and provides the ideal solution for flood zones. Thanks to advanced technology and materials such as special rubber seals, the station is completely waterproof.
Fun fact
It was internally outfitted by Deba before being installed, thanks to teamwork from design to completion.
Deba specializes in the installation of medium and high voltage substations from 3 to 17 kV. Need a reliable partner for your installation? Contact us!