DF-2 - Medium voltage switchgear: DF-P

Protection cubicle or transformer protection cubicle, with load-break switch / fuse- combination

Standaard uitrusting
  • three-pole load break switch/fuse combination, class E3 according to IEC 60420, interruption in SF6
  • double interlocked earthing switch
  • basis for HRC fuses:
    • e = 292 mm. DIN 10 at 17,5 kV
    • e = 442 mm. DIN 20 at 24 kV or UTE
  • three pole fuse trip
  • switch-off mechanism through hitting bolts
  • door-interlock
  • holder for capacitive voltage indicators
  • low-voltage compartment
Options
  • block of auxiliary contacts on load-break switch
  • block of auxiliary contacts on earthing switch
  • key lock on load-break switch
  • key lock on earthing switch
  • key locks on both
  • shunt trip release*
  • time delayed / direct under voltage release*
  • closing release
  • motor operation *
  • HRC fuses and/or spare fuses
  • contact "blown fuse"
  • automatic closing
  • set of 2 or 3 voltage transformers
  • voltage indicators
  • socle with height of 200 mm, 300 mm or 400 mm (other sizes upon request)
  • floor pans
  • push-button operation
  • remote control
* voltages available: 24 V AC/DC, 48 V AC/DC, 110 V AC/DC, 220 V AC

Contact Deba nv for other options and dimensions

Types

xhtml - css / designed and developed by ITwebburo.be b.v.b.a. / © 2006 Deba nv / version 2.0.0 / privacy policy
Friday 30 July 2010